6-STAGE IN LINE WASHER & DRY-OFF QUOTE# 16-215
GENERAL DESCRIPTION: Tanks and Tunnel to be fabricated using new formed mild steel sheets, with pow
er coated finish. Pumps, valves and controls to be rebuilt
Type: 6 Stage(s) with Blow-Off Profile Opening: 2x 5 OAL: APPROX
9
Stage 1 5 Vestibule Entry - 6 Heated Alkaline Wash Gas fired heated tank,
20-140F
5 Drain Section
Stage 2 4 Ambient Rinse with halo riser for make up water
5 Drain Section
Stage 3 8 De-Oxidizer Ambient temp
5 Drain Section
Stage 4 4 Ambient Rinse with halo riser for make up water
5 Drain Section
Stage 5 4 Trivalent Chromate 110F
5 Drain Section
Stage 6 4 Ambient Rinse with halo riser for make up water
3 Blow-Off Section - 5 Vestibule Exit
Washer Construction: Shell will be new Stainless Steel (12 ga. tanks-20 ga. tunnel) Built to the spe
ifications shown. Pumps and controls will be used/reconditioned. Pumps will be controlled via manua
start/stop stations. Electric Emersion Heaters will be used on the heated stage(s). Heaters will be
controlled via a control panel including contactors, temperature controls and safety devices.