Belyea Co Inc
2200 Northwood Ave Easton PA 18045-2239
Tel: 610-515-8775    Fax: 610-258-1230
Email: info@belyeapower.com   Web: www.belyeapower.com

1375 KW, KAWASAKI, GPC15DLE, 12470 V/3/60 HZ, NATURAL GAS - 1   Our stock number: 37288

1375 KW, KAWASAKI, GPC15DLE, 12470 V/3/60 HZ, NATURAL GAS - 1

BACKGROUND

This Gas Turbine Combined Cycle CCHP Plant is located in one of the middle
"Great Plains States" of the USA and has run for a total of 5,745 hours
(total fired hours) and 31 starts before being permanently taken off line
due to the need for more manufacturing space at the site.

Principal equipment in this offering includes:

- Kawasaki Model GPC15DLE, Natural Gas Fuel,
- Industrial Gas Turbine Generator Set
- 1375 kWe, 12.47 kV, 60 HZ (Performance Data provided herein)
- Diverter Valve and Exhaust Bypass Stack
- AC Hydraulic Start Module
- ERI Series S1-1414 Unfired Heat Recovery Steam Generator (HRSG),
10,500 pph D&S steam
- Tuthill Energy 350 kWe Steam Turbine Generator Set, (Bottoming Cycle),
480 VAC, 60 HZ, Induction Type
- Steam Turbine Surface Condenser (Ambassador ModelWCSC)
- BAC (Baltimore Air Coil) Series 3000 Cooling Tower
- HRSG Chemical Feed, Water Conditioning System,
Circulation Pumps and Storage tank
- Mycom Model G125LUD-L Screw Type, Fuel Gas Booster Compressor.
- Cutler-Hammer Type MCC Advantage Motor Control Center
- Cutler Hammer `Pow-R-Line C` Switchgear for Turbine and Steam Turbine
- Drawings, Operation & Maintenance Manuals, System Documents

Get a Quote

Company:
Contact:
Email:
Tel:
Address:
City St ZIP:
Fax:

How did you hear of us?
Additional information on your request:
   

Please enter text from above:

RETURN to listing display       RETURN to our home page