WASHING (CONTINUOUS)
Custom No. 3-stge w/blo-off Custom built 3-stage 44'L in-line parts washer, mild steel construction w/15'L Hi-velosity blow off tunnel - 1 gas heated stage:
Ref:
16212
CUSTOM 3-STAGE IN-LINE MILD STEEL WASHER & DRYOFF LINEQUOTE 16-212
1.The Washer is Approximately 44 0 Overall Length, Including Entry And Exit Vestibules. This Includes (3) Individual Stages For Cleaning/ Phosphate, Rinse And Seal Rinse With Drain Sectio
s Between Each Of The Tanks.
2.Each Tank Has A Horizontal Pump, Stainless Steel Filter Screens, Collection Tank, Drain, And Make Up Valves
3.Specifications For Each Stage Are Shown Below Approx total OAL: 44Part size capacity: 3W x 5H x 6 L
STAGESGPM
FUNCTIONTIME & TEMPPUMPS LENGTH
ENTRY 5 0
STAGE 1 90 SEC 0-140 degree (1) 12 0
DRAIN40 SEC 5 0
STAGE 240 SEC AMBIENT (1) 5 0
DRAIN40 SEC 5 0
STAGE 350 SEC AMBIENT (1) 7 0
EXIT 5 0
4.Stages are Equipped With Risers On 12 Centers, Cleaning Nozzles On Approximately 12 Centers Vertically, All Risers And Distribution Piping Are Schedule #80 CPVC. Piping From The Pump
to The Header is Steel Tube.
5.Risers are equipped with quick disconnect fittings
6.Exhaust Fans Are At Each End Of The Washer
7.Each Stage Has Independently Removable, Double, Stainless Steel Filter Screens Near The Pump Intake Area With A Retractable Dam.
8.Washer Tanks and Tunnel Are Mild Steel.
9.Access Lids Provided In The Top Of The Tanks
10.Tunnel Access between Stages
Blow-Off Tunnel
1.Tunnel to be 10 high x 6 wide x 15 long
2.Two (2) turbulator fans to provide downward air movement to remove residual water from wash cycle.
3.Steel frame to support conveyor and ceiling mounted fans.
4.Exterior aluminized interlocking panels to cover outside of frame for moisture containment.
Industrial Resources Inc
PO Box 505
Old Saybrook CT 06475-0505
Tel:
860-388-3439
Fax:
860-388-2740
Email (Request Quote):
ray@industrial-resources-inc.com
Web:
www.industrial-resources-inc.com
|
|
|  |
|
 |